Archive by month
Every entry grouped by the month it was written up, newest month first.
November 2010
- 21 November 2010Storing tools so they are there next time Woodwork and Shelving
October 2010
- 3 October 2010Hanging a run of floating shelves Woodwork and Shelving
September 2010
- 6 September 2010Levelling a shelf in a room that is not square Woodwork and Shelving
August 2010
- 19 August 2010A simple jig for repeat cuts Woodwork and Shelving
July 2010
- 22 July 2010Filling and sanding end grain Woodwork and Shelving
June 2010
- 14 June 2010Patching a plaster wall before paint Paint and Finishes
May 2010
- 28 May 2010Paint sheen, and why a wet sample lies Paint and Finishes
April 2010
- 11 April 2010Cutting in without a wobbling line Paint and Finishes
March 2010
- 15 March 2010Setting out tile from the centre Tile and Grout
February 2010
- 27 February 2010Grout colour and what it does to a pattern Tile and Grout
January 2010
- 30 January 2010Silicone joints that do not peel Tile and Grout
November 2009
- 5 November 2009Draught proofing a sash window Doors and Windows
October 2009
- 17 October 2009Exterior timber before a wet winter Yard and Porch
September 2009
- 24 September 2009Fitting a door stop and closing the gap Doors and Windows
August 2009
- 12 August 2009The door that sticks only in summer Doors and Windows
June 2009
- 18 June 2009Repointing a short run of brickwork Yard and Porch
May 2009
- 9 May 2009Paving that drains, and what happens below Yard and Porch